Soil Remediation and Site Restoration


FABCO conducted a soil boring program to fine the extent of the petroleum impacted soil after removing underground oil tank 


FABCO prepared a Work Plan before starting Project,this allows project to move fast once started.  


FABCO prepares and developes a time line to showing starting point and a finish point to restored property.  


                 Installation of Groundwater Treatment System for site de-watering


          Installation of A.B.Chance Helical Piers, FABCO only installs Chance Piers  


                                   Excavting Petroleum Impacted Soil


            FABCO opening the excavation removing the petroleum impacted soil for reycling


                                        Steel Road Plates to protect Curbing


                        Street sweeping the project on daily basis is a standard practice 


 Backfilling the Excavation with Clean Fill materials


                        Installing Construction Helical Piers for Reconstruction of Porch


                                        Completed Site Restoration of Porch and Lawn  



                                       Completed Driveway Reconstruction  


                              Driveway with new Planting's and Lawn Restoration  


The reconstruction was all done with local building permits and inspections for soil compaction and Helical Pier completion of installation certificates by the oversight Engineer. So many times work is completed without the proper permits and completion inspections from the Township.  



The Tree above was transplanted by FABCO and stored on site and kept warm during the remediation, FABCO then planted the tree in this new location once the remediation was completed.